For loads that don't fit an ordinary truck
Project cargo is the work we do most. The loads are heavy or oversized, and the destination is often far from a major port, such as a mine in Sulawesi or a power project in Nusa Tenggara.
One person in charge handles your shipment from the survey to handover on site.
Typical loads
Heavy equipment
Excavators, bulldozers, wheel loaders and cranes.
Factory machinery
Production machines, presses and packaging lines.
Power equipment
Generator sets, transformers and distribution panels.
Steel structures
Frames, girders and tanks.
Mining units
Dump trucks and processing equipment.
Project materials
Pipes, cable and construction materials.
How we handle project cargo
Survey first
We check the dimensions, weight and lifting points, then survey the road from the loading site to the unloading site.
Transport plan
We choose the trailer, vessel and schedule, then send a quote with the estimated timeline.
Permits and escort
For loads over the road size or weight limits, we arrange permits and an escort before loading day.
Unloading on site
Our person in charge stays with the shipment until it is unloaded and handed over.
Equipment and modes
Lowbed trailers
For heavy equipment and tall machinery.
Multi-axle trailers
For very heavy and long loads.
Ro-Ro vessels and barges
For crossing to the destination island.
Open-top and flat-rack containers
For loads taller than a standard container.
“Our 20-tonne excavator reached Morowali from Cikarang on schedule. Two weeks before loading, Busan’s people had already surveyed the access road to the site.”
Rudi H.
Project Logistics, nickel contractor, Central Sulawesi

Project cargo questions
We answer WhatsApp messages Monday to Saturday, 09:00 to 17:00 WIB.
How long does preparation take before loading day?
For loads that need permits and an escort, allow about one to two weeks. Loads without special permits can move sooner.
What details do you need for a quote?
Dimensions and weight from the manufacturer's specification, photos of the item, the loading and unloading addresses, and road access at both ends if you know it.
Can you deliver to a mine or project site?
Yes, as long as a trailer can use the road. If access is limited, we survey first and suggest an alternative unloading point.

Get a rate for your load
The WhatsApp message opens with fields for origin, destination, cargo type, weight and loading date. Fill them in and send.

